Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

White River - First Branch

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 55    Segment ID: T5.01-    Stream Name: Jail Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 0
  Point Bar 0
  Side Bar 6
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 0
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 2
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 762 ft.
  Dredging Dredging

Comments:
Highly straightened segment DS of Court St bridge. Series of frequent recent flood events starting with ice jam in 2007, then local microburst storms in 2008, 2009, 2010; Irene in 2011 was actually less of an impact than these more localized events. "Cleaned out" in this segment, plane bed with only a hint of riffle formation and virtually no wood.