Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 7
  Point Bar 11
  Side Bar 9
  Diagonal Bar 2
  Delta Bar 1
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 6
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 1
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 7
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing Yes
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 3,054 ft.
  Dredging None

Comments:
Bedrock grade controls account for bulk of slope change, low sinuosity but not much visible riprap- more historically? Major transmission line crosses and runs along stream mid-reach. Looks like there were some former farm-scale sand and/or gravel pits along LB, none open at this point - all vegetated. A bit unfortunate that x-sec did not capture the bedrock presence, but still believe gravel does represent overall reach d50.