Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

White River - First Branch

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 13    Segment ID: M06-    Stream Name: First Branch of the White River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 3
  Point Bar 0
  Side Bar 3
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 1
5.2 Migration Features  
  Flood Chutes 2
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 1
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 2,720 ft.
  Dredging None

Comments:
One breached dam and one intact dam in reach, 2 bridges. Owner of intact (DS) dam has applied for permits for hydro generation but has not succeeded; dam previously supplied power for woodworking and grist mill at different times. Mill Bridge just DS of this dam was knocked off by ice in 1998; ice jam progressively backed up and eventually lifted bridge off abutments. Many boulders deposited downstream of the (US) breached dam indicated a change in dominant substrate type for ~300 ft. Ph 1 indicated reference Plane bed, and it might be a coarse plane bed under reference conditions but channel changes are long-standing and hence difficult to know. Bed is clearly heavily sedimented at this point in time - combination sedimented riffles and heavily sedimented plane bed (muck). Cumulative incremental development impacts US of Rte 110 bridge have increased flood risk to DS portions of reach.