Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

White River - First Branch

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 3    Segment ID: M01-    Stream Name: First Branch of the White River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 1
  Point Bar 2
  Side Bar 4
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 4
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 2,183 ft.
  Dredging None

Comments:
Have classed as C-->E stream type departure due to aggradation and loss of planform; see Step 7 comments. Breached dam (Upper Eaton) constricts channel to ~15' in low flow, water overtops most of dam at bankfull; Lower Eaton dam is intact. First 200' of reach could have been included in Reach M02 due to valley wall and depositional features (gravel). Old toy factory mill building on right bank just upstream of intact dam has become an electronics dump; project? Also, garage at Lower Eaton's Trailer Park may have hazardous materials in floodplain. Sand substrate likely due to presence of dams; suspect gravel under reference conditions. Riffles have very little stability, and much of the more prominent deposition DS of the first 200' was organic matter and CPOM.