Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

White River - First Branch

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 2    Segment ID: M01-    Stream Name: First Branch of the White River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 1
  Point Bar 3
  Side Bar 3
  Diagonal Bar 2
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 3
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 1
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 275 ft.
  Dredging None

Comments:
Depositional area below dam. Dam has caused widening of the channel. Flood chute along right valley wall indicates channel may have historically been along the valley wall. Houses on left bank are at same level as dam.