Comments:
Original August 2001 assessment of this segment by VTDEC RMP - including 5 cross sections and Longitudinal Profile. Assessment updated with observations from Nov 2006, relying on a riffle cross section from 2001. Segment is Semi-confined and represents a subreach of alternate stream type. Minimal development / encroachments within the segment; sand and gravel quarrying along the RB valley wall near downstream end of segment. RB mass failure in this area. Downstream run-of-river flow regulation is Scott Pond Dam (M09-B).
|