Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Battenkill River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 67    Segment ID: T6.02-    Stream Name: West Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 0
  Point Bar 0
  Side Bar 0
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 1
5.2 Migration Features  
  Flood Chutes 0
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 2,704 ft.
  Dredging Dredging

Comments:
Short stretch dredged out where debris jam is forcing flooding of right bank. Dredging is to create new channel on floodplain to encourage better drainage. Segmented due to marshy wetland area, which has been made segment B.