Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Battenkill River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 17    Segment ID: M09-    Stream Name: Battenkill River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 0
  Point Bar 1
  Side Bar 0
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 1
5.2 Migration Features  
  Flood Chutes 0
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 369 ft.
  Dredging None

Comments:
One "break out" spot where outside bend of new meander treated with root wad revetment to stop erosion.