Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Battenkill River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 53    Segment ID: T3.02-    Stream Name: Lye Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 2
  Point Bar 0
  Side Bar 2
  Diagonal Bar 2
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 0
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening With Windrowing
  Straightening Length 757 ft.
  Dredging None

Comments:
Entrenched downstream due to berms on both sides. Double berms present on left bank suggesting inner one is from 1970's and earlier one from 30's. Berms prevent channel from evolving out of Stage III CES by containing sediment and flow energy within the channel.