Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Battenkill River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 38    Segment ID: T2.03-    Stream Name: Roaring Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 0
  Point Bar 0
  Side Bar 0
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 1
5.2 Migration Features  
  Flood Chutes 0
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 1
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening None
  Straightening Length 0 ft.
  Dredging None

Comments:
Segment is short section analogous to upstream segment T2.04-A. A case of mislocated Phase 1 reach break, due to VHD depicting incorrect location for RB tributary confluence. The actual confluence of the RB tributary is at / near the downstream end of this segment T2.03-D. Characteristics of this segment T2.03-D are very similar to upstream segment T2.04-A, whose cross section data has been referenced to assign an Administrative Judgement stream type of F3-PB. Valley narrows in this segment on approach to bedrock-controlled narrows in segment T2.03-C. A driveway was observed along the LB corridor at the top of a steep valley side slope. Segment corridors otherwise forested with trails for recreational access to the river. Flow bifurcates around a large, tree-covered island near downstream end of segment. Historic incision inferred due to breaching of mill dam (and local base level drop) located in segment T2.03-C (present in a c. 1880s photograph; subsequently breached perhaps in the 1927 flood). See Phase 2 report for more details.