Comments:
Windrowing and channel modifications have occurred at the top of this segment. Stream walkover reach and limited Phase 2 Assessment (steps 1, 3, 4, and 5) was completed. Bankfull width provided in Step 2.1 is a rough estimate and should not be used for design and planning purposes. Side bars present.
|