Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Mettowee River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 2    Segment ID: M01T02.02-    Stream Name: Wells Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 4
  Point Bar 7
  Side Bar 6
  Diagonal Bar 3
  Delta Bar 0
  Island Bar 1
5.2 Migration Features  
  Flood Chutes 4
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 3
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing Yes
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 1,880 ft.
  Dredging None

Comments:
Human-caused change in valley width (Reference Very Broad confinement changed to Broad) due to recent (post 1994, pre 2003) driveway along LB in downstream half of reach (upstream of Route 30 bridge). One beaver dam site indexed, but breached - so zero length of stream impounded on assessment date. Vehicle ford (infrequent) accessing from LB at wp339; more active vehicle ford crossing channel at wp340. Straightening inferred at upstream end of segment where channel is transitioning out of historically channelized/dredged/armored/bermed u/s Segment B. Channel reqaining sinuosity through aggradation and active planform adjustments in recent years as revealed by comparison of 1994 ortho to 2003 NAIP imagery.