Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Mettowee River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 21    Segment ID: M05T03.02S01.01-    Stream Name: Beaver Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 3
  Point Bar 1
  Side Bar 1
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 1
5.2 Migration Features  
  Flood Chutes 1
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing Yes
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 1,663 ft.
  Dredging None

Comments:
Slight human-caused change in valley width - not sufficient to change valley type or confinement (unconfined). Wetlands mapped contiguous to channel (NWI, VSWI). Historic straightening inferred from linear planform and close encroachment by ag fields. One arch crossing at Route 133 - bankfull constrictor - log cribbing forms base of corrugated steel arch. Horse pasture upstream of Route 133. Left-bank culvert upstream of Route 133 crossing indexed as stormwater input.