Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Mettowee River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 17    Segment ID: M05T03.01-    Stream Name: Flower Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 2
  Point Bar 2
  Side Bar 2
  Diagonal Bar 2
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 2
  Neck Cutoffs 0
  Channel Avulsions 1
  Braiding 1
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 2
  Head Cuts 1
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 0 ft.
  Dredging Dredging,Gravel Mining

Comments:
Dec 17 2000 flood caused meander migr near u/s extent. LO rechannelized and bermed. Historic STR, armoring, dredging & berming extensive fr Locker Bldg. d/s to mill pond. Has reduced channel capacity along w/ apparent incision; channel is constricted