Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 0
  Point Bar 0
  Side Bar 1
  Diagonal Bar 2
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 0
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 1
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 820 ft.
  Dredging None

Comments:
Topographic contours suggest a small alluvial fan like setting at the upstream extent of the reach. This location of localized slope reduction was likely more actively depositional in post-glacial times under more substantial flow and sediment regimes and prior to significant vegetation of the landscape. Route 30 bridge is a bankfull constrictor. Historic straightening is inferred (linear planform). Commercial encroachment (lumber yard) along the LB. 1.5-inch black plastic irrigation pipe and pump along LB for possible past irrigation use (lumber yard now mostly vacant).