Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Mill Brook - Basin 13

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 10    Segment ID: M09-    Stream Name: Mill Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 1
  Point Bar 3
  Side Bar 3
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 0
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 1,877 ft.
  Dredging None

Comments:
Historical straightening appears to be limited to the upper segment from Route 44 down to a pinch in the valley. The valley pinches naturally in the lower segment and the channel planform there was likely straight historically. Many small pieces of LWD, but overall recruitment potential very low. Channel banks are extensively armored, otherwise there would be significantly more erosion and widening (ie, channel locked into stage II). No evidence of significant overbank flow during T.S. Irene except for one bend in segment ~1,000ft downstream of Route 44.