Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 0
  Point Bar 0
  Side Bar 1
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 0
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening None
  Straightening Length 0 ft.
  Dredging None

Comments:
Channel is affected by encroachment and buffer impacts from Sheddsville Road for most of the segment. Significant channel erosion and roadway damage occurred during T.S. Irene in 2011. Mass failures along bank opposite road will likely worsen over time given the extensive hard bank armoring.