Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Upper Otter Creek

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 8    Segment ID: M21-    Stream Name: Upper Otter Creek

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar
  Point Bar
  Side Bar
  Diagonal Bar
  Delta Bar
  Island Bar
5.2 Migration Features  
  Flood Chutes 0
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 1,561 ft.
  Dredging None

Comments:
A short segment from the confluence with the East Creek in Rutland City downstream to the Ripley Mills Dam. A geomorphic assessment was not possible on this reach due to the dam influence on the stream flow. Would likely be a C3/4 reach by reference. Dam is not in use and may be a candidate for breaching.