Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Upper Otter Creek

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 3    Segment ID: M19-    Stream Name: Upper Otter Creek

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 0
  Point Bar 0
  Side Bar 0
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 0
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 5,632 ft.
  Dredging None

Comments:
This reach encompasses the area upstream of the Great Falls and hydroelectric dam in Proctor. It is an area of impounded water and therefore was not included for a full geomorphic assessment. The slope and valley width of the stream upstream of the falls indicate that the river would likely be an E type channel without the impoundment.