Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Upper Otter Creek

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 1    Segment ID: M18-    Stream Name: Upper Otter Creek

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 1
  Point Bar 2
  Side Bar 1
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 0
  Neck Cutoffs 1
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 17,040 ft.
  Dredging None

Comments:
An E5 Ripple-dune system flowing through agricultural land downstream of the Great Falls in Proctor to the confluence with Furnace Brook in Pittsford. The reach has excellent floodplain access. Great silver maples line much of the banks. Removal of riparian vegetation as well as extensive historic channel straightening have impacted the habitat of this reach. The reach is exhibiting evidence of planform adjustment, minor widening, and aggradation. Maintaining hydrologic connectivity with the old oxbows, increasing buffer width, and preventing floodplain encroachment would be important projects in this reach. Also note: silt in bed and banks unconsolidated.