Record: 15    Segment ID: M27-    Stream Name: Upper Otter Creek

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 2
  Point Bar 0
  Side Bar 0
  Diagonal Bar 0
  Delta Bar 1
  Island Bar 3
5.2 Migration Features  
  Flood Chutes 2
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 2,509 ft.
  Dredging None

Comments:
Reach has been significantly altered by history of village industry and dams. Extensive straightening, riprap, and bridge crossings. Historic diversions and dam remnants in channel and on banks. Current channel is functioning as an unincised C4, although the extent of floodplain has certainly been significantly altered by development in the village and this reach is likely acting as more of a transport reach than in its pre-settlement condition. Note: Unconsolidated silt in bed and banks.