Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Lower Passumpsic

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 37    Segment ID: T5.02-    Stream Name: Wheelock Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 2
  Point Bar 4
  Side Bar 1
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 0
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 487 ft.
  Dredging Dredging

Comments:
This reach is highly incised and entrenched due to historic armoring to protect agricultural fields and roads. Some slumping and erosion was observed in the lower reach, but banks were relatively stable throughout. Bar formation was minimal within the narrow channel, indicating sediment transport through the reach. Revetments are primarily rip-rap. stacked stone hard bank armoring was observed on the right and left banks along a house foundations, old mill abutment, and the abutments for the Chamberlain covered bridge. Total hard bank armoring length is approximately 180 feet.