Comments:
This reach is highly incised and entrenched due to historic armoring to protect agricultural fields and roads. Some slumping and erosion was observed in the lower reach, but banks were relatively stable throughout. Bar formation was minimal within the narrow channel, indicating sediment transport through the reach. Revetments are primarily rip-rap. stacked stone hard bank armoring was observed on the right and left banks along a house foundations, old mill abutment, and the abutments for the Chamberlain covered bridge. Total hard bank armoring length is approximately 180 feet.
|