Record: 9    Segment ID: T2.12-    Stream Name: Water Andric

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 6
  Point Bar 5
  Side Bar 3
  Diagonal Bar 2
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 0
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 2
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing Yes
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 437 ft.
  Dredging None

Comments:
Banks were high throughout reach with no evidence of good floodplain access. Vegetated side bars within the channel provide a small amount of additional area at bankfull. The mid to lower segment flows through an area of mowed lawn with armoring on bends and fresh bank erosion in numerous locations. The meadow upstream of the lawn area has steep vegetated banks indicating some recent slumping. The reach is highly variable upstream of Rt 2, transitioning from E to Bc, to C, to Bc, and then back to C-type based on valley confinement and entrenchment. We did not add any additional segments due to the short channel lengths within each stream type change.