Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Lower Passumpsic

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 16    Segment ID: T3.10-    Stream Name: T3 - Sleepers River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 1
  Point Bar 1
  Side Bar 0
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 0
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening None
  Straightening Length 0 ft.
  Dredging Dredging

Comments:
Large timber crib dam for a historic mill site influences bedform and sediment transport for entire reach. Channel is overwidened due to major retention of cobbles and gravel above the dam. Bankfull height was very low due to widened channel, leading to a low entrenchment ratio and a designation of F-type geometry. Road embankment on LB has led to a human caused changed in valley type from narrow to semi-confined. Combination of road encroachment and channel alterations due to dam sediment retention affect confinement/entrenchment leading to stream type departure.