Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

East Creek

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 11    Segment ID: T5.01-    Stream Name: Orwell Village Trib

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 0
  Point Bar 0
  Side Bar 0
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 0
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening None
  Straightening Length 0 ft.
  Dredging None

Comments:
This is a very sinuous segment which was not mapped well by VHD. There appears to be some unnatural high flow of water moving through this channel at times causing significant erosion and scour on outside meander bends. This segment is a little steeper slope than Segment A and the banks are less cohesive soils. There are significant areas of undercut banks with no water in the channel at this time.