Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Lamoille CCRPC

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 1    Segment ID: R2T1.01-    Stream Name: Streeter Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 2
  Point Bar 2
  Side Bar 2
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 1
5.2 Migration Features  
  Flood Chutes 2
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening None
  Straightening Length 0 ft.
  Dredging None

Comments:
Clearing along power lines comprises approz. 400' of reach and approx 1/3 of reach has much bedrock substrate with much fine sand deposited on top of bedrock. Multiple bedrock ledges (small) through middle of reach. Despite the channel dimensions suggesting an E-type channel, the majority of this reach is C-type with riffle-pool morphology.