Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Winooski Mid, Alder to Montp

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 1    Segment ID: M02.01-    Stream Name: Little River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 0
  Point Bar 2
  Side Bar 3
  Diagonal Bar 3
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 6
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 4
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 2,267 ft.
  Dredging None

Comments:
Some parts of reach are most likely a C to B stream type departure where the valley wall goes out more. Short section not as incised is probably a C still.