Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Winooski Mid, Alder to Montp

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 59    Segment ID: R13.S1.02-S1.06-    Stream Name: Thatcher Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 0
  Point Bar 1
  Side Bar 1
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 2
5.2 Migration Features  
  Flood Chutes 4
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 2
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 3
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 44 ft.
  Dredging None

Comments:
Mostly a "C" channel, upstream end above failing bridge a C to F departure due to incision.