Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

White River - Mainstem

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 21    Segment ID: R18-    Stream Name: Upper White Mainstem

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 2
  Point Bar 1
  Side Bar 1
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 4
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 1,124 ft.
  Dredging Gravel Mining

Comments:
Field notes say many unveg mid-channel bars_ two were mapped Log veins present in reach- Left bank 450 ft, right bank 200 ft. 2003 data entered in 2007 Tributary rejuvenation not assessed under protocols in place at time of data collection History of dredging throughout the reach (pers. communication from Fred Nicholson, DEC Stream Alt. Engineer, 3/07)