Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

White River - Mainstem

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 52    Segment ID: R7-S1.04-    Stream Name: Fay Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 0
  Point Bar 0
  Side Bar 0
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 0
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing Yes
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 1,667 ft.
  Dredging None

Comments:
This segment is set in a wide alluvial valley that has been historically used for hay production. Banks have dense WAD and herbaceous cover. Two crossings were observed, the first at the road that goes to Robinson Cemetery and the second crosses Brook Road. Both are constrictions to the bankfull and floodplain flows. The upstream end of this segment downstream of the crossing (~300') was enclosed by a temporary electric fence. Within the fenced in portion a large bull was free to graze and roam within the channel causing the natural E-type channel morphology to change as the banks slump.