Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

White River - Mainstem

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 105    Segment ID: T6.01-    Stream Name: Tweed River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 4
  Point Bar 2
  Side Bar 6
  Diagonal Bar 2
  Delta Bar 1
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 3
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 3
  Head Cuts 0
  Tributary Rejuvenation Yes
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 1,291 ft.
  Dredging Dredging

Comments:
Downstream of Rt 107 brdige is more entrenched than is typical of entire segment. According to Fred Nicholson, DEC Stream Alt. Engineer, dredging likely occurred historically throughout the reach; exact locations are unknown.