Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

White River - Third Branch

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 5    Segment ID: M01-S3.02-    Stream Name: M01-S3 - Camp Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Stream Channel  
4.1 Spring/Seep/Trib Minimal  
4.2 Adjacent Wetland None  
4.3 Flow Status Moderate  
4.4 Number of Debris Jams 19  
4.5 Flow Regulation Type  
  Flow Regulation Use  
  (Old Data) Impoundments None  
  (Old Data) Impoundment Location  
4.6 Up/Down Stream Flow Reg and Withdrawals None  
  (Old Data) Upstream Flow Regulation None  
4.7 Stormwater Inputs  
 
TypeNumber of Inputs
Road Ditch 2
 
4.8 Channel Constrictions  
 
TypeWidthPhoto Taken?GPS Taken?Channel constriction?Floodprone constriction?Problems
Instream Culvert4YesYesTrueTrueDeposition Above,Deposition Below,Scour Above,Scour Below,Alignment
Instream Culvert13.3YesYesTrueTrueDeposition Above,Deposition Below,Scour Above,Scour Below
Bridge36YesYesFalseFalseAlignment
Bridge18YesYesTrueTrueDeposition Above,Deposition Below,Scour Above,Scour Below,Alignment
Bedrock Outcrops12.8YesYesTrueTrueNone
4.9 Beaver Dams  
  Number of Beaver Dams 0  
  Length affected by dams 0.0  
  Bridge and Culvert Assessment? Yes