Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Mad River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 54    Segment ID: T9.03-    Stream Name: Clay Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Stream Channel  
4.1 Spring/Seep/Trib None  
4.2 Adjacent Wetland None  
4.3 Flow Status High  
4.4 Number of Debris Jams 0  
4.5 Flow Regulation Type None  
  Flow Regulation Use  
  (Old Data) Impoundments None  
  (Old Data) Impoundment Location  
4.6 Up/Down Stream Flow Reg and Withdrawals  
  (Old Data) Upstream Flow Regulation None  
4.7 Stormwater Inputs  
   
4.8 Channel Constrictions  
 
TypeWidthPhoto Taken?GPS Taken?Channel constriction?Floodprone constriction?Problems
Instream Culvert13NoNoTrueTrueDeposition Above,Scour Below
4.9 Beaver Dams  
  Number of Beaver Dams 0  
  Length affected by dams 0.0  
  Bridge and Culvert Assessment? No