Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

White River - First Branch

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 7    Segment ID: M02-    Stream Name: First Branch of the White River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Stream Channel  
4.1 Spring/Seep/Trib Minimal  
4.2 Adjacent Wetland Minimal  
4.3 Flow Status Low  
4.4 Number of Debris Jams 0  
4.5 Flow Regulation Type  
  Flow Regulation Use  
  (Old Data) Impoundments None  
  (Old Data) Impoundment Location  
4.6 Up/Down Stream Flow Reg and Withdrawals None  
  (Old Data) Upstream Flow Regulation  
4.7 Stormwater Inputs  
 
TypeNumber of Inputs
Field Ditch 3
Road Ditch 2
 
4.8 Channel Constrictions  
 
TypeWidthPhoto Taken?GPS Taken?Channel constriction?Floodprone constriction?Problems
Bridge90YesYesTrueTrueDeposition Above,Deposition Below,Scour Above,Scour Below,Alignment
Old Abutment87YesYesTrueTrueDeposition Above,Deposition Below,Scour Below
Old Abutment56YesYesTrueTrueDeposition Above,Deposition Below,Scour Above,Scour Below,Alignment
4.9 Beaver Dams  
  Number of Beaver Dams 0  
  Length affected by dams 0.0  
  Bridge and Culvert Assessment? Yes