Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

New Haven River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 37    Segment ID: T3.08-    Stream Name: Baldwin Creek

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Stream Channel  
4.1 Spring/Seep/Trib Minimal  
4.2 Adjacent Wetland Minimal  
4.3 Flow Status Moderate  
4.4 Number of Debris Jams 12  
4.5 Flow Regulation Type None  
  Flow Regulation Use  
  (Old Data) Impoundments Unknown  
  (Old Data) Impoundment Location  
4.6 Up/Down Stream Flow Reg and Withdrawals  
  (Old Data) Upstream Flow Regulation None  
4.7 Stormwater Inputs  
   
4.8 Channel Constrictions  
 
4.9 Beaver Dams  
  Number of Beaver Dams 0  
  Length affected by dams  
  Bridge and Culvert Assessment? No