Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Upper Otter Creek

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 15    Segment ID: M27-    Stream Name: Upper Otter Creek

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Stream Channel  
4.1 Spring/Seep/Trib Minimal  
4.2 Adjacent Wetland Minimal  
4.3 Flow Status Low  
4.4 Number of Debris Jams 0  
4.5 Flow Regulation Type None  
  Flow Regulation Use  
  (Old Data) Impoundments None  
  (Old Data) Impoundment Location  
4.6 Up/Down Stream Flow Reg and Withdrawals None  
  (Old Data) Upstream Flow Regulation  
4.7 Stormwater Inputs There are no storm water inputs
 
 
4.8 Channel Constrictions  
 
TypeWidthPhoto Taken?GPS Taken?Channel constriction?Floodprone constriction?Problems
Bridge108YesYesFalseTrueDeposition Below,Scour Above,Alignment
Bridge70YesYesFalseTrueDeposition Below
Old Abutment50YesYesTrueTrueDeposition Above,Scour Below
Bridge75YesYesFalseTrueDeposition Above
4.9 Beaver Dams  
  Number of Beaver Dams 0  
  Length affected by dams 0.0  
  Bridge and Culvert Assessment? Yes