Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Otter Creek - Mill River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 8    Segment ID: M05-    Stream Name: Mill River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Steep  
  Bank Texture Left Right Old
  Material Type Upper Sand Sand
  Material Type Lower Boulder/Cobble Boulder/Cobble
  Consistency Upper Non-cohesive Non-cohesive
  Consistency Lower Non-cohesive Non-cohesive
  Bank Erosion Left Right  
  Erosion Length 3,560 ft. 2,434 ft.  
  Erosion Height 6.1 ft. 6.6 ft.  
  Revetment Type None Rip-Rap  
  Revetment Length 0.0 ft. 528.9 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Deciduous Deciduous  
  Sub-dominant Shrubs/Sapling Shrubs/Sapling  
  Bank Canopy Left Right  
  Canopy Percent 26-50 26-50  
  Mid-Channel Canopy Open  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant >100 >100  
  Sub-dominant None None  
  Length where less than 25 Feet 0 455  
  Buffer Vegetation Type Left Right  
  Dominant Mixed Trees Mixed Trees  
  Sub-dominant Shrubs/Sapling Shrubs/Sapling  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Forest Forest  
  Sub-dominant Commercial None  
  Mass Failures 773 ft. 115 ft. None
  Average Failure Height 150.0 ft. 100.0 ft.
  Gullies None
  Length  
  Average Height