Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Clyde

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 8    Segment ID: M16-    Stream Name: Clyde River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Steep  
  Bank Texture Left Right Old
  Material Type Upper Clay Clay
  Material Type Lower Clay Clay
  Consistency Upper Cohesive Cohesive
  Consistency Lower Cohesive Cohesive
  Bank Erosion Left Right  
  Erosion Length 4,329 ft. 5,629 ft.  
  Erosion Height 1.4 ft. 1.1 ft.  
  Revetment Type Rip-Rap None  
  Revetment Length 108.9 ft. 0.0 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Herbaceous Pasture  
  Sub-dominant Pasture Herbaceous  
  Bank Canopy Left Right  
  Canopy Percent 26-50 1-25  
  Mid-Channel Canopy Open  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant >100 0-25  
  Sub-dominant 0-25 51-100  
  Length where less than 25 Feet  
  Buffer Vegetation Type Left Right  
  Dominant Deciduous Shrubs/Sapling  
  Sub-dominant Herbaceous Herbaceous  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Pasture Pasture  
  Sub-dominant Shrubs/Sapling Shrubs/Sapling  
  Mass Failures None
  Average Failure Height 0.0 ft. 0.0 ft.
  Gullies None
  Length  
  Average Height