Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

North Branch Winooski

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 7    Segment ID: M05-    Stream Name: North Branch Winooski River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Steep  
  Bank Texture Left Right Old
  Material Type Upper Boulder/Cobble Boulder/Cobble
  Material Type Lower Boulder/Cobble Boulder/Cobble
  Consistency Upper Non-cohesive Non-cohesive
  Consistency Lower Non-cohesive Non-cohesive
  Bank Erosion Left Right  
  Erosion Length 225 ft. 0 ft.  
  Erosion Height 2.0 ft. 0.0 ft.  
  Revetment Type Rip-Rap Rip-Rap  
  Revetment Length 112.3 ft. 1,095.5 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Shrubs/Sapling Shrubs/Sapling  
  Sub-dominant Deciduous Deciduous  
  Bank Canopy Left Right  
  Canopy Percent 26-50 1-25  
  Mid-Channel Canopy Open  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant >100 26-50  
  Sub-dominant 26-50 51-100  
  Length where less than 25 Feet 252 578  
  Buffer Vegetation Type Left Right  
  Dominant Shrubs/Sapling Shrubs/Sapling  
  Sub-dominant Mixed Trees Herbaceous  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Forest Residential  
  Sub-dominant Residential Forest  
  Mass Failures None
  Average Failure Height
  Gullies None
  Length  
  Average Height