Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

North Branch Winooski

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 58    Segment ID: T4.03-    Stream Name: Hancock Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Steep  
  Bank Texture Left Right Old
  Material Type Upper Sand Sand
  Material Type Lower Boulder/Cobble Boulder/Cobble
  Consistency Upper Non-cohesive Non-cohesive
  Consistency Lower Non-cohesive Non-cohesive
  Bank Erosion Left Right  
  Erosion Length 431 ft. 61 ft.  
  Erosion Height 3.4 ft. 4.0 ft.  
  Revetment Type Rip-Rap Rip-Rap  
  Revetment Length 114.0 ft. 100.3 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Coniferous Coniferous  
  Sub-dominant Deciduous Deciduous  
  Bank Canopy Left Right  
  Canopy Percent 51-75 51-75  
  Mid-Channel Canopy Open  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant >100 >100  
  Sub-dominant None None  
  Length where less than 25 Feet 0 0  
  Buffer Vegetation Type Left Right  
  Dominant Mixed Trees Mixed Trees  
  Sub-dominant Coniferous Coniferous  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Forest Forest  
  Sub-dominant None None  
  Mass Failures 39 ft. 55 ft. Multiple
  Average Failure Height 60.0 ft. 40.0 ft. 50.0 ft.
  Gullies None
  Length  
  Average Height