Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

North Branch Winooski

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 3    Segment ID: M02-    Stream Name: North Branch Winooski River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Undercut  
  Bank Texture Left Right Old
  Material Type Upper Silt Silt
  Material Type Lower Silt Silt
  Consistency Upper Cohesive Cohesive
  Consistency Lower Cohesive Cohesive
  Bank Erosion Left Right  
  Erosion Length 170 ft. 376 ft.  
  Erosion Height 4.0 ft. 3.2 ft.  
  Revetment Type Rip-Rap Rip-Rap  
  Revetment Length 217.1 ft. 838.4 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Shrubs/Sapling Shrubs/Sapling  
  Sub-dominant Invasives Herbaceous  
  Bank Canopy Left Right  
  Canopy Percent 1-25 1-25  
  Mid-Channel Canopy Open  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant >100 0-25  
  Sub-dominant 51-100 26-50  
  Length where less than 25 Feet 0 1416  
  Buffer Vegetation Type Left Right  
  Dominant Deciduous Herbaceous  
  Sub-dominant Shrubs/Sapling Shrubs/Sapling  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Forest Residential  
  Sub-dominant Shrubs/Sapling Other  
  Mass Failures None
  Average Failure Height
  Gullies None
  Length  
  Average Height