Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Mill Brook

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 2    Segment ID: M02-    Stream Name: main stem

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Steep  
  Bank Texture Left Right Old
  Material Type Upper Mix
  Material Type Lower Mix
  Consistency Upper Non-cohesive
  Consistency Lower Non-cohesive
  Bank Erosion Left Right  
  Erosion Length 0 ft. 0 ft.  
  Erosion Height 0.0 ft. 0.0 ft.  
  Revetment Type Rip-Rap Rip-Rap  
  Revetment Length 51.1 ft. 57.1 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Coniferous Deciduous  
  Sub-dominant Lawn Herbaceous  
  Bank Canopy Left Right  
  Canopy Percent 51-75 26-50  
  Mid-Channel Canopy Open  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant 51-100 0-25  
  Sub-dominant 26-50 51-100  
  Length where less than 25 Feet  
  Buffer Vegetation Type Left Right  
  Dominant Mixed Trees Mixed Trees  
  Sub-dominant Herbaceous Herbaceous  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Forest Forest  
  Sub-dominant Residential Hay  
  Mass Failures None
  Average Failure Height 0.0 ft. 0.0 ft. 0.0 ft.
  Gullies None
  Length  
  Average Height 0.0 ft.