Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Rock River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 67    Segment ID: QT3.01-    Stream Name: Brandy Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Steep  
  Bank Texture Left Right Old
  Material Type Upper Mix Mix
  Material Type Lower Mix Mix
  Consistency Upper Non-cohesive Non-cohesive
  Consistency Lower Non-cohesive Non-cohesive
  Bank Erosion Left Right  
  Erosion Length 89 ft. 83 ft.  
  Erosion Height 2.0 ft. 1.5 ft.  
  Revetment Type Rip-Rap Rip-Rap  
  Revetment Length 137.9 ft. 131.8 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Coniferous Deciduous  
  Sub-dominant Herbaceous Herbaceous  
  Bank Canopy Left Right  
  Canopy Percent 76-100 26-50  
  Mid-Channel Canopy Closed  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant >100 0-25  
  Sub-dominant 26-50 >100  
  Length where less than 25 Feet 0 337  
  Buffer Vegetation Type Left Right  
  Dominant Coniferous Herbaceous  
  Sub-dominant Deciduous Deciduous  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Forest Pasture  
  Sub-dominant Pasture Forest  
  Mass Failures 93 ft. Multiple
  Average Failure Height 10.6 ft. 11.0 ft.
  Gullies 0 None
  Length 0 ft.  
  Average Height