Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Black Creek Head

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 6    Segment ID: M09-    Stream Name: Black Creek

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Steep  
  Bank Texture Left Right Old
  Material Type Upper Silt Silt
  Material Type Lower Silt Silt
  Consistency Upper Cohesive Cohesive
  Consistency Lower Cohesive Cohesive
  Bank Erosion Left Right  
  Erosion Length 923 ft. 507 ft.  
  Erosion Height 3.4 ft. 3.8 ft.  
  Revetment Type None Rip-Rap  
  Revetment Length 0.0 ft. 74.4 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Bare Bare  
  Sub-dominant Pasture Pasture  
  Bank Canopy Left Right  
  Canopy Percent 0 0  
  Mid-Channel Canopy Open  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant 0-25 0-25  
  Sub-dominant None None  
  Length where less than 25 Feet 2339 2014  
  Buffer Vegetation Type Left Right  
  Dominant Herbaceous Herbaceous  
  Sub-dominant None None  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Pasture Pasture  
  Sub-dominant Crop Forest  
  Mass Failures None
  Average Failure Height
  Gullies None
  Length  
  Average Height