Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Winooski - Cabot

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 32    Segment ID: T3.04-    Stream Name: unnamed

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Moderate  
  Bank Texture Left Right Old
  Material Type Upper Sand
  Material Type Lower Gravel
  Consistency Upper Non-cohesive
  Consistency Lower Non-cohesive
  Bank Erosion Left Right  
  Erosion Length 50 ft. 175 ft.  
  Erosion Height 2.5 ft. 2.5 ft.  
  Revetment Type None None  
  Revetment Length 0.0 ft. 0.0 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Coniferous Coniferous  
  Sub-dominant None None  
  Bank Canopy Left Right  
  Canopy Percent 76-100 76-100  
  Mid-Channel Canopy Closed  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant >100 >100  
  Sub-dominant None None  
  Length where less than 25 Feet  
  Buffer Vegetation Type Left Right  
  Dominant Mixed Trees Mixed Trees  
  Sub-dominant None None  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Forest Forest  
  Sub-dominant None None  
  Mass Failures None
  Average Failure Height
  Gullies
  Length  
  Average Height