Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Winooski - Montpelier to Cabot

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 31    Segment ID: R22-    Stream Name: Winooski River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Undercut  
  Bank Texture Left Right Old
  Material Type Upper Sand Sand
  Material Type Lower Mix Mix
  Consistency Upper Non-cohesive Non-cohesive
  Consistency Lower Non-cohesive Non-cohesive
  Bank Erosion Left Right  
  Erosion Length 411 ft. 303 ft.  
  Erosion Height 9.0 ft. 7.2 ft.  
  Revetment Type None Rip-Rap  
  Revetment Length 0.0 ft. 2,196.4 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Herbaceous Herbaceous  
  Sub-dominant Shrubs/Sapling Shrubs/Sapling  
  Bank Canopy Left Right  
  Canopy Percent 26-50 1-25  
  Mid-Channel Canopy Open  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant >100 0-25  
  Sub-dominant 51-100 None  
  Length where less than 25 Feet 982 4375  
  Buffer Vegetation Type Left Right  
  Dominant Mixed Trees Herbaceous  
  Sub-dominant Coniferous Shrubs/Sapling  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Forest Hay  
  Sub-dominant Shrubs/Sapling Commercial  
  Mass Failures 0 ft. 0 ft. One
  Average Failure Height 0.0 ft. 0.0 ft. 25.0 ft.
  Gullies 0 None
  Length 0 ft.  
  Average Height