Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Huntington River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 15    Segment ID: M09-    Stream Name: Huntington River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Steep  
  Bank Texture Left Right Old
  Material Type Upper Gravel
  Material Type Lower Gravel
  Consistency Upper Non-cohesive
  Consistency Lower Non-cohesive
  Bank Erosion Left Right  
  Erosion Length 282 ft. 26 ft.  
  Erosion Height 0.0 ft. 0.0 ft.  
  Revetment Type Rip-Rap Rip-Rap  
  Revetment Length 357.1 ft. 44.7 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Deciduous Herbaceous  
  Sub-dominant Herbaceous Deciduous  
  Bank Canopy Left Right  
  Canopy Percent 1-25 1-25  
  Mid-Channel Canopy Open  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant 0-25 0-25  
  Sub-dominant  
  Length where less than 25 Feet 0 0  
  Buffer Vegetation Type Left Right  
  Dominant Deciduous Herbaceous  
  Sub-dominant Herbaceous Deciduous  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Other Hay  
  Sub-dominant  
  Mass Failures None
  Average Failure Height
  Gullies None
  Length  
  Average Height