Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Huntington River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 6    Segment ID: M03-    Stream Name: Huntington River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Steep  
  Bank Texture Left Right Old
  Material Type Upper Bedrock Bedrock
  Material Type Lower Bedrock Bedrock
  Consistency Upper Cohesive Cohesive
  Consistency Lower Cohesive Cohesive
  Bank Erosion Left Right  
  Erosion Length 137 ft. 137 ft.  
  Erosion Height 10.0 ft. 11.5 ft.  
  Revetment Type None None  
  Revetment Length 0.0 ft. 0.0 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Deciduous Deciduous  
  Sub-dominant Herbaceous Herbaceous  
  Bank Canopy Left Right  
  Canopy Percent 51-75 51-75  
  Mid-Channel Canopy Open  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant >100 >100  
  Sub-dominant 0-25 None  
  Length where less than 25 Feet 0 118  
  Buffer Vegetation Type Left Right  
  Dominant Deciduous Mixed Trees  
  Sub-dominant Herbaceous Herbaceous  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Forest Forest  
  Sub-dominant Pasture None  
  Mass Failures None
  Average Failure Height
  Gullies None
  Length  
  Average Height