Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Hungerford Brook

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 26    Segment ID: M4T2.05-    Stream Name: Unnamed Trib-1 to Hungerford-M04

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Undercut  
  Bank Texture Left Right Old
  Material Type Upper Sand Sand
  Material Type Lower Sand Sand
  Consistency Upper Non-cohesive Non-cohesive
  Consistency Lower Non-cohesive Non-cohesive
  Bank Erosion Left Right  
  Erosion Length 73 ft. 0 ft.  
  Erosion Height 4.0 ft. 0.0 ft.  
  Revetment Type None None  
  Revetment Length 0.0 ft. 0.0 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Herbaceous Shrubs/Sapling  
  Sub-dominant Invasives Invasives  
  Bank Canopy Left Right  
  Canopy Percent 1-25 1-25  
  Mid-Channel Canopy Open  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant 0-25 0-25  
  Sub-dominant 0-25 0-25  
  Length where less than 25 Feet 1018 1002  
  Buffer Vegetation Type Left Right  
  Dominant Herbaceous Shrubs/Sapling  
  Sub-dominant Invasives Invasives  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Hay Crop  
  Sub-dominant None None  
  Mass Failures None
  Average Failure Height
  Gullies 1 None
  Length  
  Average Height