Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Lewis Creek

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 33    Segment ID: M20-    Stream Name: Lewis Creek

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Steep  
  Bank Texture Left Right Old
  Material Type Upper Sand Sand
  Material Type Lower Gravel Gravel
  Consistency Upper Non-cohesive Non-cohesive
  Consistency Lower Non-cohesive Non-cohesive
  Bank Erosion Left Right  
  Erosion Length 206 ft. 261 ft.  
  Erosion Height 4.0 ft. 4.9 ft.  
  Revetment Type Rip-Rap None  
  Revetment Length 206.8 ft. 0.0 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Deciduous Deciduous  
  Sub-dominant Herbaceous Herbaceous  
  Bank Canopy Left Right  
  Canopy Percent 51-75 51-75  
  Mid-Channel Canopy Open  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant 0-25 >100  
  Sub-dominant 26-50 0-25  
  Length where less than 25 Feet 602 360  
  Buffer Vegetation Type Left Right  
  Dominant Deciduous Deciduous  
  Sub-dominant Herbaceous None  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Hay Forest  
  Sub-dominant Pasture Crop  
  Mass Failures None
  Average Failure Height
  Gullies None
  Length  
  Average Height